How to maintain and overhaul storage tanks

Plastic storage tank manufacturers suggest that in order to ensure the safe production of enterprises, safe operation of equipment, increase the service life of equipment and labor productivity, the mechanical equipment must be regularly inspected and repaired to prevent mechanical failure and affect production, or cause mechanical accidents. Casualties, actual production, safe operation procedures and safety maintenance management system, after research and development of the annual tank maintenance and overhaul. The overhaul period of the tank is generally: 60-120 days for repair, and 12 months for overhaul.
Medium repair: Plastic tank manufacturer prompts to eliminate running, running, dripping, and leaking. Clean or replace the liquid gauge repair or replace the inlet, outlet and drain valve to clear the cooling water coil. Check repair safety valve vent flame arrestor. Repair coatings and insulation.
Overhaul: Including the repair of the internal parts of the tank repairs, repairs or replaces sections of the tanks where cracks, severe corrosion, etc. are found. Repair can use polymer composite repair. According to internal and external inspection requirements, and after repair or replacement of tube sections, leak testing or hydraulic tests are required. In addition to embroidery insulation. Deal with other problems found in internal and external inspections of tanks.

T Post & L Stay are made of mild steel,

treatment surface :hot dipped galvanized ,epoxy coated to color RAL6005/RAL7016/RAL9005.

Triple protection.

packing onto pallet.

T Post & L Stay

T Post,L Stay Post Epoxy Coated,L Stay Post Triple Protection,L Stay Post

HeBei Fortune Trade Co.,Ltd. , https://www.gardfence.com