If you pay close attention, you will find that the ground under your feet can be simple and fashionable, and you can pursue green life in a colorful way. Let the ground become a kind of smart art. Our unremitting mission is very important. If the construction process is very important, if something goes wrong. In the later stage, it may cause a series of problems such as sanding and dusting on the concrete floor, which greatly reduces the service life of the cement floor. The maintenance after cement construction is also very important. After concrete pouring, the reason why it can gradually solidify and harden is mainly because of the result of cement hydration, while hydration requires proper temperature and humidity conditions, so in order to ensure concrete With suitable hardening conditions, the strength is constantly increasing and the concrete must be cured.
Since the maintenance of cement floors is so critical, how should it be cured? The winglet takes you to find out.
First, the maintenance method
There are two ways to maintain the concrete floor: natural conservation and steam curing, and natural conservation is usually used. There are two basic requirements for natural curing cement floors:
1. After the pouring is completed, it should be cured within 12 hours;
2. Before the ç ¼ strength reaches C12, it is strictly forbidden for anyone to walk on it and install the formwork bracket, and it is not allowed to be used for impact or any beating above.
Second, the maintenance process
Generally, the insulation and moisturizing method of covering and curing is adopted, and the process is as follows:
1. First of all, we must consider the thickness of the film, not too thick or too thin. Because it is too thick, it will cause waste of resources. If it is too thin, the plastic film will be easily broken, so that it will not be able to moisturize. Then the width of the plastic film, we should ensure that the width of the plastic film is greater than the width of the ground, beyond 60 cm. Cover both sides with dirt to prevent moisture loss. After that, it should be noted that the overlap width between the film and the film is greater than 40 cm;
2, should begin to cover the maintenance after the initial setting, the covering can be wheat straw, rotten grass mat, bamboo curtain, sack piece, fabric and other water-absorbing materials. During the coating, the coverings should be intact and overlapped with each other. Do not leave gaps between the coverings, otherwise the quality of the ground will be reduced, resulting in partial failure of the concrete floor.
3. After the final setting, watering the covering (after 12 hours), you can set a watering schedule, and regularly sprinkle the ground. The watering tool can use water pipes, buckets and other tools to ensure the wetness of the concrete.
Third, maintenance attention
1. The cement floor is at any curing time. If the temperature of the curing water poured onto the cement floor is lower than the temperature of the cement floor, the temperature difference between the two should not exceed 15 °C;
2. During the maintenance of cement floor, attention should be paid to the use of thermal insulation measures to prevent the cement floor from undergoing drastic changes due to environmental factors such as exposure to sunlight and sudden temperature drop;
3. The temperature between the core and surface layer of the concrete and the surface layer and the environment during curing should not exceed 20 °C. Before the construction of mass concrete, strict maintenance plan should be formulated to control the internal and external temperature difference of concrete to meet the design requirements.
Fourth, curing time
The most important aspect of the cement floor is the first 7 days of maintenance. During these 7 days, we must ensure that the ground is seamlessly moisturized. The average ground maintenance time is two to three weeks. If the temperature is high, it will be maintained for a few days, but it should not be less than two weeks. If the weather is cold, it is necessary to extend the maintenance time appropriately. It should be more than three weeks. If it is a special location, it needs to be maintained for a month, and the specific situation is analyzed. The following table can be used as a reference:

The above is a process of how to maintain the concrete floor and some precautions. After the concrete is poured, the concrete floor must be remembered for maintenance. This is very important for the concrete floor of your construction to achieve a good ground effect. Pay attention to the late maintenance of the cement floor.

Plate-making editor: ground handling expert winglet
Please reprint the above article, please indicate the source or contact us for authorization.
Professional floor grinding machine manufacturers Xingyi Machinery ()
If you pay close attention, you will find
The ground under the foot can be simple and stylish, or colorful
Pursuing a green life and making the ground a smart art is our unremitting mission.

Click on the title to read the original
"The new star in the floor - "Platinum Crystal Floor""
"What should I do with sand on the concrete floor? Xingyi Machinery for you to solve"
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn
Steal Cnc Milling Parts,Stamping Parts Stainless Steel Parts,Custom Metal Factory Deep,Deep Drawing Stamping Parts
JIANGSU TONGDE INTERNATIONAL TRADE CO.LTD. , https://www.tongdetrade.com