Time: January 20
Location: Putuo
Decoration Company: Yifan Decoration
Supervisor: Ma Guojun
Community name: Wanli Yazu
Construction phase: hydropower acceptance
This Xiao Bian running site is also decorated with water and electricity acceptance, really doing a good job. As for the good, we can wait and see. When Xiao Bian arrived, the acceptance had actually begun. The panting Xiao Bian refused to take a rest and quickly followed up and took out the camera and patted it. First of all, of course, it was necessary for everyone to see the scene of the site.
Come to the door.
1. Line tube is distinguished by different colors
Very professional red and blue lines, in fact, Xiao Bian personally feel that although the red and blue lines give a very standard and professional feel, that is, the difference between strong and weak electricity, but the quality and ordinary wire and pipe are not much different. The price will increase, so it is recommended that you do not need to be too eager for this kind of decoration users (doing mud, no one can see, there are wood).
Living room scene, fairly clean and tidy.There are some precautionary notes on the wall of the living room. At first sight, it is the time the horse supervision was started!
2. Arrangement of outlets and conduits
Kitchen line tube and socket location. No slotted wire pipe, no more than 3 parallel pipes, slotted wire pipe, 1cm gap between the pipe and pipe, easy to repair pipe slot mortar, line pipe corner requirements greater than or equal to 120 degrees, the box embedded The level is the same, 8cm distance is ensured between the strong electric box and the weak electric box, and the foil tube must be wrapped and isolated at the intersection of the line tube.
TIPS: Ordinary sockets (including air-conditioner cabinets, bidets, kitchen cabinets, sterilizers, enclosed balcony sockets) 35cm from the floor, air-conditioning sockets 220CM from the ground, electric water heater sockets 180CM from the ground, gas water heater sockets from the ground 140CM, Kitchen socket 120CM from the ground, open balcony socket including bathroom mirror light socket, washing machine socket) 130CM from the ground, soot socket from the ground 230CM, gas stove socket from the ground 60CM, refrigerator 30CM from the ground.
Hydropower installation hydropower acceptance hydropower reform