1, material preparation ---- including tiles, primer materials, leveling materials and bonding materials.
2, paving tools ready ---- safe and good tools is a guarantee of smooth construction.
3, grass-roots cleanliness treatment --- The surface of the base layer will affect the bonding strength of loose materials, dust and oil and other removal.
4. Priming on the grass-roots level—The purpose is to enhance the adhesion strength of the screed and tile adhesive layer to the wall surface and the ground.
5, wipe the leveling layer ---- find the reference plane, to ensure the smooth laying of the tile surface.
6, the separation of bullets ---- draw lines pre-arranged, to determine the reasonable position of each tile.
7, paste the tiles.
8, sew, wipe and clean the brick surface.
9, conservation.
2, paving tools ready ---- safe and good tools is a guarantee of smooth construction.
3, grass-roots cleanliness treatment --- The surface of the base layer will affect the bonding strength of loose materials, dust and oil and other removal.
4. Priming on the grass-roots level—The purpose is to enhance the adhesion strength of the screed and tile adhesive layer to the wall surface and the ground.
5, wipe the leveling layer ---- find the reference plane, to ensure the smooth laying of the tile surface.
6, the separation of bullets ---- draw lines pre-arranged, to determine the reasonable position of each tile.
7, paste the tiles.
8, sew, wipe and clean the brick surface.
9, conservation.
ceramic tile
Elevator Components,Elevator Parts,Basic Elevator Components,Traction Elevator Components
Suzhou Stable Trade Co., Ltd , https://www.stable-elevator.com