At present, there are generally three kinds of ground leveling methods, machine grinding plus plaster leveling, cement mortar leveling, and self leveling and leveling.
Machine grinding plus plaster leveling:
1. Do not increase the ground
2. Walk 2 hours after construction (work)
3. The construction can be wooden flooring in 3 days
4. The construction is fast (only one day per household) and the price is affordable, which is much more favorable than cement leveling and self-leveling.
Cement mortar leveling:
1. Increase ground minimum 2 cm
2. It can be stepped on (construction) for 3 days after construction
3. After the construction is completed, wait at least 15 days after laying the wood floor
4. The level of moderate self-leveling leveling:
1. Go to the highest point of the room
2. Cannot enter people after construction for 24 hours
3. After construction, almost 15 days after the cement is to be applied to the wood floor.
4. The highest price of construction conditions:
1. Machine grinding plus plaster leveling: Construction can be done at any time (preferably after the wall and floor tiles of the kitchen and bathroom are finished).
2. Cement leveling and self-leveling Leveling: It must be done after the kitchen and bathroom tiles have been finished and between the walls.
Machine grinding plus plaster leveling:
1. Do not increase the ground
2. Walk 2 hours after construction (work)
3. The construction can be wooden flooring in 3 days
4. The construction is fast (only one day per household) and the price is affordable, which is much more favorable than cement leveling and self-leveling.
Cement mortar leveling:
1. Increase ground minimum 2 cm
2. It can be stepped on (construction) for 3 days after construction
3. After the construction is completed, wait at least 15 days after laying the wood floor
4. The level of moderate self-leveling leveling:
1. Go to the highest point of the room
2. Cannot enter people after construction for 24 hours
3. After construction, almost 15 days after the cement is to be applied to the wood floor.
4. The highest price of construction conditions:
1. Machine grinding plus plaster leveling: Construction can be done at any time (preferably after the wall and floor tiles of the kitchen and bathroom are finished).
2. Cement leveling and self-leveling Leveling: It must be done after the kitchen and bathroom tiles have been finished and between the walls.
Del floor nature floor cement room floor tile bathroom floor tile
Side Emitting PMMA Fibre Harnesses
Fiber Optic Side Glow Cable also known as Side Glow, Side Lit, or Lineal light cable is made from stranded or Solid core Polymer with a clear heat shrink jacket. Our stranded Sideglow cable is designed for tighter turns and longer runs, which is suitable for installation indoors or out. They are most often used to provide light lines in paving or stair fronts or for illuminating around the perimeter of swimming pools. Also Stranded is best in wet locations.
Side Glow Fiber Optic Filament,Side Light Fiber Optic,Fiber Optic Side Glow Cable,Led Fibre Optic Lighting
Jiangxi Daishing POF Co.,Ltd , https://www.jxopticfibrelight.com