Multi-Span CNC Welding Fabricated Peb Primary Steel Structure

Model NO.: 5-3-62
Door: Gate Door/ Steel Door/ Roller Shutter Door
Roof: Sandwich Panel / Single Steel Sheet
Insulation: PU/EPS/Glass Wool/Rock Wool
Wall: Sandwich Panel / Single Steel Sheet
Gutter: Galvanized, Stainless Steel, PVC, Alu Gutter
Transport Package: by Steel Frame Bundled in Bulk Ship
Origin: China
HS Code: 7308900000
Model NO.: 5-3-62
Door: Gate Door/ Steel Door/ Roller Shutter Door
Roof: Sandwich Panel / Single Steel Sheet
Insulation: PU/EPS/Glass Wool/Rock Wool
Wall: Sandwich Panel / Single Steel Sheet
Gutter: Galvanized, Stainless Steel, PVC, Alu Gutter
Transport Package: by Steel Frame Bundled in Bulk Ship
Origin: China
HS Code: 7308900000
Company advantage:
1. We supply for Hyundai, SEPCOIII, Siemens etc.
Exported to more than 60 countries, with more than 200, 000 tons.
2. Biggest steel structure manufacturer in northern China, annual output 200, 000 tons.
Registered capital: USD 16million
120 engineers and 1260 staff in total.
3. ISO9000, ISO14000, ISO18000
American certificate system of CWI, AWS welder
European certificate system of EN-1090, EN welder
4. Our group is Canada listed company, total asset 4 billion, 3600 employees.


 
Performance is a hard truth
SN Project Name  Tons or Area
1 Steel structure for India JHARSUGUDA 9*135MW Power Plant 25,000 tons
2 First-stage project of India JHARSUGUDA 6*600MW Power Plant 24,000 tons
3 Steel structure for India BALCO 4*300MW Coal-firing Power Station 16,000 tons
4 Major workshop& ECR of 3*660MW, CLP Power Station, India 5500 tons
5 Steel structure for Nigeria Power Station Project 4000 tons 
6 Steel structure for  Vietnam  2*30MW Power Station Workshop 2100 tons 
7 Steel structure for  Indonesia  TANJUNGENIM 3*12MW Power Plant 1200 tons
8 India WPCL4*135 Coal-firing Power Station 3000tons 
9 Luli Group steel Making Workshop 11500 tons
10 Shoudu Iron and Steel company project, 2006 4100 tons
11 Steel Structure of Qingdao Laigang  Mansion , 33 floors, Heavy H Beam and Tubular Pillar 3600tons 
12 South Korean Hyundai Steel Project 2950 tons 
13 Steel Structure for Saudi Arabia HCP2*10000T/D cement plant 1600 tons
14 Philippines  Ship Company Main Workshop 3600 tons
15 Workshop of Deruibao Tires Company, project area 112,000SQM
16 1-5# Workshop of Huaxing Industrial Park, 2010, project area  86,000SQM



Multi-Span CNC Welding Fabricated Peb Primary Steel Structure


1. How to build a Steel building ( made of fabricated peb Primary steal structure ) , please check the following table :
Design Data ( important )  live load on roof ( KN / M2 )  
 wind speed ( KM / H ) 
 snow load ( KG / M2 ) if have 
Size ( important )  width
 length
 height 
 roof slope
Type  single slope or double slope       
 muti slope or single span
 double-span or Multi-span        

 single floor  or two floors
Inter column 5m , or 6m ….
Windows & Door 1 . quantity   
2 . size  
3 . Location
4 . PVC or aluminum
Column &Beam straight cross-section OR Variable cross-section
Roof & Wall Panel 1 . Colorful corrugated steel sheet  0.326~0.8mm thick , YX25-210-840 ( 840mm wide )
2 . sandwich panel with EPS , ROCK WOOL , PU etc , insulation thickness around 30 ~ 300mm 

3 . sheet+glass fiber(thick 50mm~200mm)
Purlin 1 . C purlin 
2 . Z purlin
Accessories Do you need the skylight belts , Ventilators,down pipe , out gutter etc ?
Surface Treatment Shot blasting with anti rust paint or hot dip galvanize


2. About us:
Our company commenced its operations in 2004, and pioneered the high-end metal building products market in China. We have been the first mover in China, right from workshop, high rise building, Steel building ( made of fabricated peb Primary steal structure ) etc to all kinds of pre-engineered buildings.
Today, we are a leading turnkey Pre-Engineered Steel building Construction Solution provider in China with integrated facilities for design, manufacture, logistics, supply and project execution capabilities for pre-engineered steel buildings. We holds a significant part of market share in Asia for metal building systems. We works in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects.

We are also a certified green building partner and all our products comply with international green norms.
Multi-Span CNC Welding Fabricated Peb Primary Steel Structure

3. Internationalized marketing:
Thus far, our steel structure and steel building sell well throughout the world, 90% product exported, exported to more than 40 countries, such as Germany, America, Slovakia, Saudi Arabia, South Africa India, Indonesia, Oman, Bengal, Egypt, Vietnam, Nigeria, Philippines, Namibia, Morocco, Angola, Brazil, Grenada, Sudan, Pakistan, Zambia, Jordan, Tanzania, Bosnia and Herzegovina, Turkey, Iraq, Kuwait, Myanmar, Singapore, Dubai, Argentina, the United Arab Emirates, Chile, Cameroon, Colombia, Cuba, Algeria, Ethiopia, Equatorial Guinea, Iran, Laos, New Zealand, Panama etc.
The exported weight reaches more than 300,000 tons.
Multi-Span CNC Welding Fabricated Peb Primary Steel Structure

4. How we ensure the high quality of Steel building ( made of fabricated peb Primary steal structure ) :
After years of exploration, practice and improvement, our company has built an experienced technical team in steel structure. Every project is supposed to go through the following procedures:
1) Owing plasma cutting, flame cutting, available to provide multiple cutting service.
2) Well-experienced engineer team and production team for steel structure fabrication, welder working with CWI certificate, according to WPS( welding procedure specification) and PQR( procedure qualification record) .
3) Professional non-destructive testing, fully equipped.
4) Professional surface treatment: sandblasting, paint spraying, powder coating as per American standard.
5) More than 10 years steel structure fabrication experience
6) Full set of manufacturing process plan to ensure delivery on time.
Multi-Span CNC Welding Fabricated Peb Primary Steel Structure

5. The Steel building ( made of fabricated peb Primary steal structure ) features:
1) Prefabricated and customized design.
2) Low foundation cost, thanks to the light weight of the structure itself.
3) Easy construction, time-saving, and labor saving
4) Light steel structure workshop ID flexible layout, beautiful appearances, and higher space efficiency.
Multi-Span CNC Welding Fabricated Peb Primary Steel Structure

6. FAQ:
1) I just need a small  Steel building ( made of fabricated peb Primary steal structure ), do you accept small order ?
It' s no problem, we would like to grow up with you together.

2) I am a designer; Can you help me to produce the steel structure which we designed ?
Our mission is to help customers to be successful. So it' s welcome if we can help you solve problem and make your design come true.

3) Can you offer Door to Door service ? Because i do not know how to do customs clearance.
Yes. We can make Door to Door service to help you save much time of shipping. Also we have big discount with shipping company because we have do much of this every day. So it will save your time also money.


  Company advantage:
1. We supply for Hyundai, SEPCOIII, Siemens etc.
Exported to more than 60 countries, with more than 200, 000 tons.
2. Biggest steel structure manufacturer in northern China, annual output 200, 000 tons.
Registered capital: USD 16million
120 engineers and 1260 staff in total.
3. ISO9000, ISO14000, ISO18000
American certificate system of CWI, AWS welder
European certificate system of EN-1090, EN welder
4. Our group is Canada listed company, total asset 4 billion, 3600 employees.


 
Performance is a hard truth
SN Project Name  Tons or Area
1 Steel structure for India JHARSUGUDA 9*135MW Power Plant 25,000 tons
2 First-stage project of India JHARSUGUDA 6*600MW Power Plant 24,000 tons
3 Steel structure for India BALCO 4*300MW Coal-firing Power Station 16,000 tons
4 Major workshop& ECR of 3*660MW, CLP Power Station, India 5500 tons
5 Steel structure for Nigeria Power Station Project 4000 tons 
6 Steel structure for  Vietnam  2*30MW Power Station Workshop 2100 tons 
7 Steel structure for  Indonesia  TANJUNGENIM 3*12MW Power Plant 1200 tons
8 India WPCL4*135 Coal-firing Power Station 3000tons 
9 Luli Group steel Making Workshop 11500 tons
10 Shoudu Iron and Steel company project, 2006 UV Sterilizer

UV sterilizer can be use in office,home. Use for surface sterilizing such as table, documents, etc, it can be also use as air sterilizer. Moreover, Ultraviolet-ray sterilizing is one of the cleanest, most non-pollution, non-chemical, without any color and odor and leaves no residue. Ultraviolet-ray is also able to kill virus and bacteria in a natural way. Still have an advantage is ultraviolet ray sterilizer volume is small, the home is used also very convenient.

Uv Sterilizer Aquariumuv ,Ultraviolet Sterilizer,Coralife Uv Sterilizer,Best Uv Sterilizer

JIANGMEN LEDERLIGHT LIGHTING Co.,LTD , https://www.ledpolelights.com