Pump installation

1, according to the preparatory work before installation: (1) check the pump and motor to ensure that no damage during transport and handling. (2) Prepare tools and hoisting machinery and check the basis of the machine according to the drawing. 2, according to the order: (1) the entire pump at the end of the scene, have installed the motor, leveling base, you can not remove the pump and motor. (2) The base on the foundation, ready to fill the concrete after leveling. (3) Use the level meter to check the level of the base with the outlet of the pump. Level the anchor bolts and lengthen the anchor bolts with concrete. (4) Place the ruler on the coupling (up, down, front and back) and check if the pump and motor shaft coincide. (5) After the concrete of the anchor bolt to be fixed is completely dry, tighten the nut of the anchor bolt. Finally, check the levelness of the entire unit, and when there is slight unevenness, it can be leveled by the wedge iron. (6) Press fitted suction and outlet pipe, when the pipe and pump combination, should be careful not to increase the weight of the pipe and pressure on the pump, so as to avoid pump deformation. (7) Clean up the environment and maintain hygiene.

Draining Basket/rack

stainless steel, sink strainer,fruit vegetable washing drain basket,kitchen tool,draining rack, draining basket.

Shenzhen Lanejoy Technology Co.,LTD , https://www.baking-rack.com