Blank house installation considerations

In today's expensive housing, rough housing has also won the favor of many people. For young people pursuing individuality, how to decorate the rough room can be renovated according to their own preferences, so that their own home has more of their own personality. The decoration of the rough room must first consider the installation of hydropower. For those who are new to the decoration, you must complete the article on the installation of water and electricity for the rough room. This will greatly help you.

Blank house installation considerations

1. The aluminum pipe or PPR pipe used must be a qualified product that has been tested and delivered. Hot and cold water pipes should use different colors.

2. In the construction process, to minimize unnecessary joints in the wall tube body, there is no way to connect the external faucet, toilet, basin. All the tubing joints are wrapped in hemp and white paint, tightened and placed in a horizontal and vertical position. In the event of a crossover on the ground pipe, the secondary pipe must be installed below the main pipe. Keep the overall water distribution on a horizontal line.

3. Precautions for decoration of rough house After the pipe is in place, the pipe must be clamped at the turning place or at the place where the pipe is tapped, so as not to loosen the pipe. Water pipe fixing requires the use of a special pipe card.

4. Precautions for rough house decoration All the water places must be installed with water pipes and floor drains. When the pipes of pvc pipes are connected, they must be covered with special pvc glue. And note that when the horizontal drop is connected to the main sewer pipe embedded in the original blank house, it should remain stationary for 6 hours.

5. As far as possible, use light keel as the water pipe, cement tile is the most prone to problems, so pay attention to tile water in place, use good quality cement.

6. If the main sewer pipe buried in the original rough room is not enough or not ideal or not in place, the sewer pipe may be re-opened in the floor according to the actual situation, and the pipe with fireproof rubber may be used to seal the pipe around. In the newly sealed area, a 10mm high circle is surrounded by cement mortar. After solidifying for 48 hours, the circle is filled with water and permeated into the floor for 24 hours to see if there is any water seepage around the newly installed sewage pipe. For example, it does not prove that the new pipeline is qualified, otherwise, it needs to be reprocessed, and then the water seepage test is conducted until it is qualified. In addition, in order to facilitate the overhaul, the manholes are reserved slightly larger when the water pipe is installed.

7. Precautions for rough house decoration Kitchen hygiene requires waterproofing in the slot.

The above is a brief introduction to the installation of water and electricity in rough houses and I hope to help you. For more information on hydropower installation, please continue to pay attention to this site information.

Blank Room Renovation Budget Blank Room Blank Room Renovation Cost Hydropower Installation Hydroelectric Design

Komatsu Engine Parts

Komatsu Engine Parts,Komatsu Engine,Komatsu Engine Spare Parts,Engineering Machine Parts

JINING SHANTE SONGZHENG CONSTRUCTION MACHINERY CO.LTD , https://www.stszcmparts.com