Many of the owners’ friends have expressed their interest in integrated ceilings. For this reason, Xiao Bian specially found senior experts in the industry to conduct on-site purchase explanations for ceilings, allowing consumers to learn some methods of purchase and identification. There is also a new understanding of integrated ceilings.
Plates and related electrical appliances with integrated ceilings on the construction site
A series of auxiliary materials for the installation of ceilings at the construction site: edge strips, keels, suspenders, etc.
The construction officially begins. First, the professional installation master measures the dimensions of the kitchen space and determines the appropriate height. After marking, mark the wall.
Fig. 1: Master Teng marks the height of the mark carefully on the wall
Figure 2: Marks written by the attentive master on the wall after measurement.
Figure 3: Drilling with a tool at a suitable place on the wall
Figure 4: Wall hole after drilling
Fill the entire hole with the ready-made chips for the next fixing work
Fig. 1: Fine measurement of the edge strips with a fixed ruler
Figure 2: The master cuts carefully according to the size just measured. The master is very careful.
The installation of integrated ceilings is a detailed task. Be careful and each step must be very precise. It is necessary to work hard on the edge strips like this kind of corner. This is the fine work of installation and it is also the most important part of installing ceilings.
After the strip is fixed, fix it with nails at the spot
Some walls are not capable of heavy construction such as drilling, and the installation masters use a special glue to stick the strips to the tiles on the wall. The firmness is also very good.
Coated side strips
Sidebar installation process completed
Next, it is necessary to work on the roof. According to the procedure for the treatment of the edge strips, drill holes and fix them at the right position after the measurement. Then install the vertical boom, attached to the keel attached to the boom, and then buckle into the buckle. The entire installation process ended in this way. The overall effect of the ceiling was perfectly presented to us.
The difference between ordinary ceiling and integrated ceiling:
Material aspect
Integrated ceiling: The composition of the buckle plate is aluminum-magnesium alloy. The advantages are: not easy to aging, not easily aging, not easy to be corroded.
Ordinary ceiling: The composition of the buckle plate is mostly recycled aluminum, and the overall weight is relatively heavy.
Installation
Ordinary ceiling: In the installation, only the space is fixed around the space. With the increase of the use time, according to the principle of gravity, the entire ceiling will fall toward the middle.
Integrated ceiling: easy maintenance, cleaning, disassembly. More elaborate than the ordinary ceiling installation process and fine work. The integrated ceiling is double-fixed, and the joints of the edge strip and the top keel ensure the service life of the entire ceiling. The long-term use will not create the problem of ordinary ceilings.
Ceiling installation space, the United States and the United States kitchen ceiling tile adhesive
Thick Wall Steel Tubing/Thick Wall Steel Tube/Thick Wall Steel Pipe are produced by Hot Rolling, Cold Drawn or Cold Rolling production method,
with thick wall to 100mm.
The size range:
OD: 10-420mm
WT: 5-100mm
Length: according to customers PO, cutting to short pcs available (Pls refer to below pictures of cutting and packing)
Application:
The Heavy Wall Steel Tubing are used in the field of:
Machinary to specific parts for auto parts, machines, agricultrual indusctry etc.
Thick Wall Steel Tubing
Thick Wall Steel Tubing,Seamless Thick Wall Steel Tubing,Thick Wall Steel Square Tubing,Thick Wall Stainless Steel Tubing,Thick Wall Steel Tube,Thick Wall Steel Pipe,Heavy Wall Steel Tubing
Torich International Co.,Ltd--The Steel Tube Maker , http://www.chinasteeltubepipe.com