After getting the house, many people didn't know how to check it. Now we invite experts to teach us a few things about the house. There are also items listed here that are effective for acceptance of any type of house, including acceptance of commercial offices.
1. Look at the walls to see if there is any seepage in the walls. It is best to visit the house on the second day after heavy rains before the house is handed over. If there is a problem with the wall at this time, it is almost insignificant.
Another problem is whether the wall is cracked. A friend once reflected that his family had a crack in a door shape. Later, he asked the developer to know that it was originally an elevator freight port left behind during construction. Later, when it was sealed up, it was handled in a sloppy manner to stay in trouble.
2. Check the hydropower first to check whether the hydropower of the house is open. Of course, for some high-end renovations, most of the hydropower will be replaced in the later period, so sometimes these are not critical, but if you do not plan to replace water and electricity, then these things must be carefully accepted.
In addition to seeing if electricity is available, it is mainly to see whether or not the wire meets the quality of the national standard. Then the cross-sectional area of ​​the wire meets the requirements. In general, the wires in the home should not be less than 2.5 square meters, and the air-conditioning line should reach 4 squares. Otherwise, when the air conditioner is used, it is easy to overheat and soften.
3, waterproof waterproof here, refers to the kitchen and toilet waterproof. The method of acceptance of waterproofing is: using cement mortar as a door to block the toilet, and then cover it with a plastic bag, then put it in a solid state, and then put the water in the toilet, shallow (about 2cm high) ). Afterwards, the owners who are downstairs are expected to check the ceiling of their home toilet after 24 hours. The main locations for water leakage are: direct leakage of the floor slab; contact between the pipeline and the floor.
Warm tips:
At present, some houses that have been delivered have already declared that they have not done waterproofing. This requires renovation. If waterproofing is already done at the time of delivery, we have to verify whether the waterproofing is done well. If you do not try before the renovation, leaking water after the renovation, then the maintenance project will be big. You have to remove the floor that has been renovated to make a new waterproof layer.
4. The pipeline referred to in the inspection pipeline refers to the drainage/pollution pipeline. Utah is a sewage outlet such as a balcony. When it is accepted, take a water-filled appliance in advance and pour water into the outlet. See if the water is flowing smoothly. Why do you have to accept this? Because during construction, some workers often “stolen†this work when cleaning. Put some cement residue into the drain and run away. If the cement is more viscous, it will clog at the elbow and cause drainage difficulties.
There is also a case where the sewage pipe has a water storage deodorant elbow. According to experience, if the sewage pipe does not contain water and deodorant elbow, then the overall quality of the house will have to hit 12 points.
Why do the sewage pipes need such elbows, because the elbows will store water so that the smell from the lower pipes will be blocked under this layer. Without an elbow, the laundry outlets and toilet drains emit a odor. There may be developers who think that the use of anti-odor floor drains will work. The practice of the project has proved that the deodorant floor drain is far from meeting actual needs. And because of this small place, it is often best to reflect the construction quality of the builders.
1. Look at the walls to see if there is any seepage in the walls. It is best to visit the house on the second day after heavy rains before the house is handed over. If there is a problem with the wall at this time, it is almost insignificant.
Another problem is whether the wall is cracked. A friend once reflected that his family had a crack in a door shape. Later, he asked the developer to know that it was originally an elevator freight port left behind during construction. Later, when it was sealed up, it was handled in a sloppy manner to stay in trouble.
2. Check the hydropower first to check whether the hydropower of the house is open. Of course, for some high-end renovations, most of the hydropower will be replaced in the later period, so sometimes these are not critical, but if you do not plan to replace water and electricity, then these things must be carefully accepted.
In addition to seeing if electricity is available, it is mainly to see whether or not the wire meets the quality of the national standard. Then the cross-sectional area of ​​the wire meets the requirements. In general, the wires in the home should not be less than 2.5 square meters, and the air-conditioning line should reach 4 squares. Otherwise, when the air conditioner is used, it is easy to overheat and soften.
3, waterproof waterproof here, refers to the kitchen and toilet waterproof. The method of acceptance of waterproofing is: using cement mortar as a door to block the toilet, and then cover it with a plastic bag, then put it in a solid state, and then put the water in the toilet, shallow (about 2cm high) ). Afterwards, the owners who are downstairs are expected to check the ceiling of their home toilet after 24 hours. The main locations for water leakage are: direct leakage of the floor slab; contact between the pipeline and the floor.
Warm tips:
At present, some houses that have been delivered have already declared that they have not done waterproofing. This requires renovation. If waterproofing is already done at the time of delivery, we have to verify whether the waterproofing is done well. If you do not try before the renovation, leaking water after the renovation, then the maintenance project will be big. You have to remove the floor that has been renovated to make a new waterproof layer.
4. The pipeline referred to in the inspection pipeline refers to the drainage/pollution pipeline. Utah is a sewage outlet such as a balcony. When it is accepted, take a water-filled appliance in advance and pour water into the outlet. See if the water is flowing smoothly. Why do you have to accept this? Because during construction, some workers often “stolen†this work when cleaning. Put some cement residue into the drain and run away. If the cement is more viscous, it will clog at the elbow and cause drainage difficulties.
There is also a case where the sewage pipe has a water storage deodorant elbow. According to experience, if the sewage pipe does not contain water and deodorant elbow, then the overall quality of the house will have to hit 12 points.
Why do the sewage pipes need such elbows, because the elbows will store water so that the smell from the lower pipes will be blocked under this layer. Without an elbow, the laundry outlets and toilet drains emit a odor. There may be developers who think that the use of anti-odor floor drains will work. The practice of the project has proved that the deodorant floor drain is far from meeting actual needs. And because of this small place, it is often best to reflect the construction quality of the builders.
Entrance decoration children's room decoration house decoration house cement house toilet door
There have three type screw pumps: 1. Single Screw Pump. 2. Three Screw Pump. 3. twin screw pump 1. single screw pump usually been used to transfer sludge, mud, sauce etc thick liquid. 2. three screw pump usually beed usde to transfer the temperature not higher than 150 degree diesel fuel oil, lubricating oil etc oil. and heat insulation triple screw pump beed used to transfer bitumen, heavy oil etc, pump can bear 300 degree high temperature.
Screw Pump,Screw Type Pump,Screw Vacuum Pump,Rotary Screw Pump
Hengshui Yuanhan Trading Co.,Ltd , https://www.hengshuiyuanhanpump.com