After the housing decoration is completed, it is indispensable for acceptance. The owner accepted the project, and the standard was the decoration contract, the construction drawing signed by the owner, and relevant documents of the relevant state department on the quality inspection of the decoration project. The acceptance was mainly carried out in the following aspects:
Furniture: The lines are smooth, the sealing line, the corner line and the panel interface are dense and smooth, the sliding of the door cabinet drawer is smooth, and the handle is symmetrical and beautiful.
Power lines: The circuit shall be laid in accordance with construction regulations and safety standards. The socket shall not be less than 30 cm from the ground. The three-wire socket shall be grounded. The kitchen and air-conditioning lines shall be laid in dedicated lines. The main gate shall be equipped with a leakage prevention switch and the lamps shall be firmly installed.
Doors and Windows: The switch is easy, and the door frame, window frame and glass are well sealed.
Ground: The floor tiles are flat, clear in texture, uniform in color, horizontal and vertical in the cross line, the floor is paved with smoothness, the joints are straight, and the paint has uniform color and no scratches.
Wall: The wallpaper has firm paste, tight joints, complete pattern, consistent pattern, clean edges and no burrs, and the coating is even and smooth, without any bumps, no color, and no dust.
Water supply and drainage facilities: The water supply pipe has no leakage, the on-off Valve operates well, and the drainage is smooth without leakage or water accumulation.
Paint: smooth paint, good feel, enough oil, no nails, scratches, burrs and color.
Furniture: The lines are smooth, the sealing line, the corner line and the panel interface are dense and smooth, the sliding of the door cabinet drawer is smooth, and the handle is symmetrical and beautiful.
Power lines: The circuit shall be laid in accordance with construction regulations and safety standards. The socket shall not be less than 30 cm from the ground. The three-wire socket shall be grounded. The kitchen and air-conditioning lines shall be laid in dedicated lines. The main gate shall be equipped with a leakage prevention switch and the lamps shall be firmly installed.
Doors and Windows: The switch is easy, and the door frame, window frame and glass are well sealed.
Ground: The floor tiles are flat, clear in texture, uniform in color, horizontal and vertical in the cross line, the floor is paved with smoothness, the joints are straight, and the paint has uniform color and no scratches.
Wall: The wallpaper has firm paste, tight joints, complete pattern, consistent pattern, clean edges and no burrs, and the coating is even and smooth, without any bumps, no color, and no dust.
Water supply and drainage facilities: The water supply pipe has no leakage, the on-off Valve operates well, and the drainage is smooth without leakage or water accumulation.
Paint: smooth paint, good feel, enough oil, no nails, scratches, burrs and color.
Three trees Paint Paint Switch Lacquer Decor Sockets Window glass Bricks Chests of drawers Glass furniture Kitchen Doors Floor tiles Glass doors Kitchen glass Sliding doors
A/C Remote Control,Universal Ac Remote,Universal Aircon Remote,Air Conditioner Remote Control
LONG TERM ELEC. CO., LTD , https://www.longterm-hvac.com