Although many users choose hardcover rooms today, some users still like to decorate themselves according to their wishes. Then the rough room is a good choice. Even if the rough can not be relaxed, it is necessary to play the spirit of 120,000 points to inspect the house.
Everything is difficult at the beginning. In the rough room inspection room, you must first remember to verify the authenticity of the completed construction record card, and check the counterparty's "Completion Acceptance Record Form". Also look at the three books, a certificate, a table, "Construction Engineering Quality Certification", "House Use Instruction", "Residential Quality Assurance Certificate", "Comprehensive Acceptance Certificate of Real Estate Development and Construction Project Completion," and "Architectural Completion Acceptance Record Form." In addition, the area of ​​the purchase contract should be controlled according to the actual area measurement report data (the official seal of the surveying and mapping team).
Inspection details 1, check the attachment of the purchase contract and supporting facilities
2. Net area measurement, bay depth and net height measurement
3, floor hollowing, cracks, sand inspection
4. Wall emptying, cracks, cracks, explosions, flatness, yin and yang angle inspection
5, roof inspection
6, door, window installation quality and accessories inspection
7, conduct leak test
8, circuit insulation, grounding detection
9, to the installation of drainage quality inspection
10. Detection of other detailed structures
Inspection of strong and weak electricity
1, first check the installation of the meter, whether the meter specifications meet the requirements, and record the degree of the start of the meter 2, and then check the distribution box box accessories are complete, set aside the number of empty open 3. Check whether the indoor lighting and socket power are normal and whether the wiring is reasonable. 4. Check whether the security system is consistent with the agreed delivery standard in the contract.
Check the drainage system 1. Check the installation of the water meter. Check whether the joints before and after the water meter are leaky. Record the water meter's reading 2 and test the water pressure to see if the water pressure is too large or too small 3. Check the upstairs Whether there is leakage in the drainage pipe 4. Check whether the number of water supply points is consistent with the contract attachment. 5. Check whether the drainage pipes of the kitchen, bathroom, and balcony are complete or unblocked. 6. Check whether the kitchen and toilet drainage risers are set separately.
Wall 1ã€Inspect the wall surface for large area emptying phenomenon and whether there are obvious cracks 2ã€Check whether the flatness and the yin and yang angle are founder 3ã€Check whether the external wall has insulation measures according to relevant national requirements.
Ground 1, check the flatness, level 2, check whether there is a large area empty drum phenomenon 3, check for obvious cracks, sanding phenomenon
Kitchen 1 Check whether the size of the door opening and the ventilation opening area meet the standards. 2 Check whether the gas pipeline and gas meter are in place. 3 Check whether the drain pipe is installed with a fire ring. 4. Check the flue hole and check valve. 5. Check the quality of the ceiling and the floor.
WC 1, check whether the size of the door hole meets the requirements 2, check whether the drain pipe is equipped with a firestop ring 3, check the reserved exhaust passage, check whether the opening and check valve is complete, 4. Check the leakage condition of the toilet floor 5. Check the quality of the ceiling
There are many reasons for delaying the submission of PS. It is acceptable to postpone months if it is a general engineering problem. However, if it is because of the problem of the developer's capital chain, it cannot be started. It is recommended that the owner promptly negotiate with the developer and check out.
Everything is difficult at the beginning. In the rough room inspection room, you must first remember to verify the authenticity of the completed construction record card, and check the counterparty's "Completion Acceptance Record Form". Also look at the three books, a certificate, a table, "Construction Engineering Quality Certification", "House Use Instruction", "Residential Quality Assurance Certificate", "Comprehensive Acceptance Certificate of Real Estate Development and Construction Project Completion," and "Architectural Completion Acceptance Record Form." In addition, the area of ​​the purchase contract should be controlled according to the actual area measurement report data (the official seal of the surveying and mapping team).
Inspection details 1, check the attachment of the purchase contract and supporting facilities
2. Net area measurement, bay depth and net height measurement
3, floor hollowing, cracks, sand inspection
4. Wall emptying, cracks, cracks, explosions, flatness, yin and yang angle inspection
5, roof inspection
6, door, window installation quality and accessories inspection
7, conduct leak test
8, circuit insulation, grounding detection
9, to the installation of drainage quality inspection
10. Detection of other detailed structures
Inspection of strong and weak electricity
1, first check the installation of the meter, whether the meter specifications meet the requirements, and record the degree of the start of the meter 2, and then check the distribution box box accessories are complete, set aside the number of empty open 3. Check whether the indoor lighting and socket power are normal and whether the wiring is reasonable. 4. Check whether the security system is consistent with the agreed delivery standard in the contract.
Check the drainage system 1. Check the installation of the water meter. Check whether the joints before and after the water meter are leaky. Record the water meter's reading 2 and test the water pressure to see if the water pressure is too large or too small 3. Check the upstairs Whether there is leakage in the drainage pipe 4. Check whether the number of water supply points is consistent with the contract attachment. 5. Check whether the drainage pipes of the kitchen, bathroom, and balcony are complete or unblocked. 6. Check whether the kitchen and toilet drainage risers are set separately.
Wall 1ã€Inspect the wall surface for large area emptying phenomenon and whether there are obvious cracks 2ã€Check whether the flatness and the yin and yang angle are founder 3ã€Check whether the external wall has insulation measures according to relevant national requirements.
Ground 1, check the flatness, level 2, check whether there is a large area empty drum phenomenon 3, check for obvious cracks, sanding phenomenon
Kitchen 1 Check whether the size of the door opening and the ventilation opening area meet the standards. 2 Check whether the gas pipeline and gas meter are in place. 3 Check whether the drain pipe is installed with a fire ring. 4. Check the flue hole and check valve. 5. Check the quality of the ceiling and the floor.
WC 1, check whether the size of the door hole meets the requirements 2, check whether the drain pipe is equipped with a firestop ring 3, check the reserved exhaust passage, check whether the opening and check valve is complete, 4. Check the leakage condition of the toilet floor 5. Check the quality of the ceiling
There are many reasons for delaying the submission of PS. It is acceptable to postpone months if it is a general engineering problem. However, if it is because of the problem of the developer's capital chain, it cannot be started. It is recommended that the owner promptly negotiate with the developer and check out.
Home inspection decoration contract construction contract
Balcony Railing Balustrades & Handrails
Indoor Balcony Railing,Rust Proof Balcony Railing,Waterproof Balcony Railing,Stainless Steel Indoor Balcony Railing
Suzhou CoreMission International Trading Co.,Ltd. , https://www.szcoremission.com