Wall Flour Steps, Wall Flour Tips

In fact, when decorating the house, there are always a lot of problems. The heads of households can’t face it. If you want to use the first big thing, you must first paint the wall. When you paint the wall, don’t underestimate it. A lot of learning, do you know what steps are there? What are the other skills? Next, the home of the decoration is for everyone to introduce the wall brush steps and wall brush tips, I hope everyone can refer to.


墙面粉刷步骤


A wall brush step


1. Wall brushing steps, wall quality inspection. This step should be completed in the housing phase. First of all, you should first check whether the wall that needs to be painted in the room is solid and level. If there are large cracks and holes in the wall, developers or property should be recommended to redo. Individual hole phenomena can be filled with plaster.


2. Wall brushing steps, preparation before scraping the putty. Make sure that the wall is solid and flat. Use a steel brush or other tool to clean the wall so that the wall is as free of floating and floating. Put the concrete interface agent on the wall roller as much as possible, and after it is dry (usually more than 2 hours), you can scrape the putty.


3. Wall brushing steps, scratching water-resistant putty. Before the putty is put, the flatness of the wall should be measured with a measuring ruler of 2M or more to determine the method of scraping the putty. Generally, the wall surface can be scraped with 2 layers of putty, which can both level and cover the background color. Putty with poor flatness needs to be scraped several times in the local area. If the flatness of the wall is extremely poor, consider scraping the plaster for leveling and then putting the putty. The interval between each putty batch scraping should be more than 2 hours (after drying).


4. Wall brushing steps, sanding putty. After the water-resistant putty, the putty is polished 1 to 2 days later. Grinding can be done at night, with a light bulb of more than 100 watts close to the wall lighting, while polishing to check the level of flatness.


5. Wall brush steps, brush the primer. After cleaning the dust on the surface of the polished putty, the primer can be applied. The primer can be applied once, and it must be uniform. After it is dry (2~4 hours), the next step can be carried out.


2. Wall brush tips


1. The main body is demolished and rebuilt. The main body dismantling is the first project, including demolition, wall building, shovel wall peeling, demolition of heating, plastic steel windows and so on. The dismantled garbage should be cleaned up in time to ensure that the interior is clean and more convenient for future construction.


2. Hydropower transformation, before the hydropower transformation, cabinet designers should come to the door for the first measurement, help determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc., and formulate transformation plans. The water heater is also best to send people, according to the model you choose, design the location of the power supply and interface. The air conditioner and its power supply should be placed on the wall of the bed as much as possible to avoid direct air conditioning to the person.


墙面粉刷步骤


3. Stick wallpaper, paste wallpaper is much better than brush wall paint. After the wall paint is brushed, the oil union will brush the lacquer in the place where the wallpaper is needed. The paint will dry out every other day, and then the wallpaper can be attached.


4. Install the socket panel. The socket panel can be installed for about half a day. It should be noted that the socket is best to buy the switch function, especially the kitchen. In this way, the rice cooker and the microwave oven can be free from plugging and unplugging the power supply, and can be controlled by the switch.


5. Installation of cabinet cabinets is a matching project, and the range hood, stove and sink should be purchased in advance. It is best to send it on the same day and install it at the same time as the cabinet.


6. Install the finished door, the finished door should be installed before the floor. Mainly because of the complicated loading steps, hinges, door locks, door stoppers, door frames, etc., there are many tools used, such as installing the floor first, it is difficult to avoid bumps.


7. Install the hardware. It is recommended to install the scraps, curtain rods, lamps, sanitary wares, sanitary wares, etc. before the floor is installed. If the procedures are reversed, it is likely to cause damage to the floor.


Don't underestimate the project of painting the wall. There is also a study. The above article is about the steps of wall brushing and wall brushing. If you say Xiaobian, you don’t know much. If you want to know For more renovation information, please continue to pay attention to the decoration home network.


More related wonderful reading:

Old house decoration wall flour brush construction old house decoration wall flour brush points

Old house decoration wall flour brush construction old house decoration wall flour brush points

Wall Flour Brush Construction Plan Introduction Wall Flour Brush Construction Precautions

Black Color Rebar Coupler, which is different from the Silver Color Rebar Coupler. It doesn't processed with strip the ex-circle. So this type of coupler keep the raw material color.

Only the color is black, the material is same with 45C or 40Cr material.

It  is used to rebar mechanical splicing in reinforced concrete structure, and is designed to connect threaded rebar with diameter from 12mm to 50mm.

Black Color Rebar CouplerBlack Color Rebar CouplerBlack Color Rebar Coupler

Black Color Rebar Coupler

Black Color Cold Forged Rebar Coupler,Reducer Rebar Coupler,Rebar Coupler Joint,Civil Engineering Products Rebar Coupler

BAODING JINDI MACHINERY CO., LTD , https://www.rebarconnectors.com