Installation of various gas water heaters

Outdoor unit standard installation

Installation method: installed on the outer wall surface or open balcony, the user reserves the hot water pipeline or the dark pipe according to the installation position of the water heater. Note: The position of the power socket and the dark line of the position of the remote controller are arranged in advance during the decoration process. The socket should be installed in a place where it cannot be rained, and if a rainproof socket box is to be installed, or if the power cord of the machine has a sufficient length, the socket should be installed indoors. Required installation materials: 1. Hot and cold water stainless steel bellows (requires 2cm thick insulation material and heating cable outside the water pipe) 2. Open balcony

Outdoor unit + QU-S open balcony installation

Installation method: Option 1: Outdoor unit + QU-S installed on the exterior wall or open balcony. Option 2: The machine is installed on the outer wall, and the QU-S is installed in the cabinet of the kitchen cabinet. Note: 1. The user is based on the water heater. Or the location of the QU-S is reserved for the hot water circulation pipeline and the cold water pipeline concealed pipe 2, the position of the power outlet and the dark line of the installation position of the remote controller. The user installs it in advance during the decoration process. 3. The socket is installed in the rain. Where, and if you want to install a rainproof socket box, or if the machine power cord has a sufficient length, you need to install the socket indoors: 1. Outdoor unit 2, open balcony 3, outside the cold water pipe Add 2cm of insulation material 4, QU-S (both indoor and outdoor)

Indoor unit standard installation

Required installation materials: 1, control panel 2, hot and cold water stainless steel bellows 3, gas special pipe 4, gas special valve 5, hot and cold water angle valve

Indoor unit smoke pipe ceiling hidden installation

Required installation materials: 1. Ceiling-type aluminum gusset plate 2, stainless steel special exhaust pipe 3. Special aluminum foil sealing tape at the pipe joint interface Note: 1. When installing plastic gusset plate, it is necessary to make fireproof and heat-insulating treatment for the pipe. If there are wires, wires and water pipes in the ceiling, keep a safe distance of more than 5cm from the exhaust pipe.

Indoor cabinet installation

Installation method: The user needs to reserve the hot and cold water pipe and power cord socket in the installation position of the machine before the decoration. Note: The position of the power socket and the installation position of the wire controller are dark, and the user needs to install it in advance during the decoration process. Material: 1. Ventilation shutter door 2, smoke pipe 3, hot and cold water stainless steel bellows 4, gas special pipe 5, hot and cold water angle valve